Products Commercial Installation Operator’s Nov-99Heating Furnace And Manual
12
Cox systems are shipped “ready to use”. All Employ qualified, experienced installers, to necessary standard equipment, cont
ASSEMBLIES A. Casing Jacket F. Stack G. CK. Inspection Port onnector L. Fiberglass Rope Seal H. Heat hanger M. Combus
SPECIFICATIONS izontal Units) SO-225 SO- 25,000 400put-Gas BTU/HR
CLEARANCES Un nstruction, and/suchothe ABOFLU Wcom SO Maclea 6” a 6” above horizontal warm air duct within 6” of furn 48” 18” om flue pipe
6 The draft may be accurately red with any good draft gauge. ractically all installations. Proper, uniform draft ator will usually pay for itself in
7flue- flue the e of ore the the the sftl opening may be used for ocedure – The test procedure is as follows: 1 e burner shall be operated and
8r the installation of the u er, tank, and controls have been completed and refully checked. 3) capures4)5)6)7)op8) Cladsh AS OIL3. 4. 5. 6. 7. 8.
9has ld be rechecked during func bustion is proper diffe OIL2)6) n that fire burns clean and that draft gulator is in good working order and adjuste